Bạn đang xem bản rút gọn của tài liệu. Xem và tải ngay bản đầy đủ của tài liệu tại đây (60.92 KB, 2 trang )
PB-Nr: M06.01.03
Filling of tanks
Issued by Date Version Page
Hr. Heinl Juli 2001 0
1/2
Process owner: Hr. Heinl
Prozessprupose and
target:
Abschlauchen of Tank car
car flow/process documentation/competence
1. Preparation
The driver of the tank car has to make the connection between tank cars and
recipient tank on statement of the responsible magazine coworker
2. Monitoring
Here is to be monitored:
• possible one max. quantity recipient tank
• admissible printing in the tank
• safe, fixed link of the lines
• grounding link
• tightness of the flanges and lines